AZ3 test
Terms
undefined, object
copy deck
- How many digits are in a buno number?
- 6
- How is a date written on a xray?
- MMDDYY
- How is item V on an XRAY reported?
- home and deployed
- What si the first position of an aircraft strike damage code?
- Category
- What is the second postion of a n aircraft strike damage code?
- Employment
- Whta is the third postion of an aircraft strike damage code?
- Cause
- What is the fourth postion of an aircraft strike damage code?
- Disposition
- Who maintains the aircraft record "A" card?
- Logs and records
- Who maintains the master Buno log?
- CNO
- How many hours do you have to submit an acceptance XRAY?
- 48
- How many months after an aircraft transfer or strike is the "A" card maintained?
- 12
- What logbook form is used to draft or rebuild an "A" card?
- Monthly flight summary
- What dates is the aircraft accounting audit report due?
- 31 AUG, 30 NOV, 28/29 FEB, 31 May
- Is teh end of teh quater (EOQ) report submitted on all engines both installed and uninstalled?
- NO
- What is the satus Star code for EPSM's that are at CNATT activities?
- 48-60
- At a minimum of how many years shall EPSM's at CNATT activities must be changed?
- 3
- What is the only engine component that is tracked in AEMS?
- F110 afterburner
- What EPSM's are transferred directly to NAVAIRDEPOT Jacksonville?
- F114 EPSM's
- When an aircraft is transferred is an ETR required on installed engines?
- YES
- What status star code is used for engines that are excess and awaiting disposition?
- 41-01 and 41-02
- In the absence of a type wing/mals within how many calendar days must corrections be submitted?
- 30
- What is the total number of data elements in AEMS?
- 20
- What data elements are required on all ETR's?
- 0-6 and 19
- Transactions in AEMS must be reported by _______ on the _____ working day.
- 2400 First
- If you use ETR number 999 whta is the next ETR number that will be used?
- 001
- What is the status satr code for an EOQ report?
- 11-90
- What status star code would you use for removel of an RFI engine?
- 21-74
- You are assigned to AIMD NORTH ISLAND and you are transferring an engine to USS NIMITZ, what staus star code do you use?
- 22-60
- If an engine is downgraded or removed at a SDLM activity is an ETR required?
- YES
- You are assigned to logs and records in VAW-117, What is the downgrade code you would use for metal in oil?
- 2N
- By what day of the month will all EOQ reports be submitted?
- 7
- What statement is to be used for an EOQ Report if no bare firewalls exists?
- zero bare firewalls this report
- What is the status star code that is used for an over the wing gearbox change?
- 11-48
- Are ETR's subject to minimize?
- NO
- How are tenths of hours accounted for an EOQ and ETR report?
- dropped
- What transaction serial number is used on a transaction correction?
- same as original report
- Within how many hours after receipt of a correction request by higher authority is recieved must the correction be submitted?
- 24
- What are the two types of formats that manuals are seperated into?
- conventional and workpackage
- What are the two types of technical manuals?
- Operational and maintenance
- What is an example of a correct work package number?
- 000 01
- What are the two types of manuals that are used in Naval Aviation?
- Technical manuals and maintenance manuals
- What program is technical publication defiency reporting (TPDR) part of?
- NAMDRP
- What are the two categories of TPDR's?
- CAT I and CAT II
- TPDR's are tracked by what number?
- report control number
- What do the first five digits of an RCN reflect?
- UIC
- What do the last four digits of an RCN reflect?
- serial number
- What is the time frame for submitting a CAT I TPDR?
- 24 hours
- What reeport is submitted for an error in a NATOPS manual?
- OPNAV form 3710/6
- How often does a technical directives summary come out?
- weekly
- How long shall technical directive summaries be kept on file?
- 6 months
- How often does an IRAC tracker come out?
- weekly
- How long shall IRAC trackers be kept on file?
- 6 months
- Where can a complete listing of all IRACs be obtained from?
- NATEC website
- Who is responsible for auditing the CTPL?
- QAO
- How often at a minimum shall the CTPL be audited?
- 12 months
- How often will a CTPL audit a dispersed library at a minimum?
- 3 months
- What is the term useed for reduction of transmission of message traffic during emergencies?
- minimize
- Who has the authority to request minimize?
- CO
- Who may cancel a message?
- Originator
- Message directives are cancelled within how many days if no cancellation dates are established in the original messages?
- 90
- What is the prescedence code for a flash message?
- Z
- What is the Prescendence code for a routine message?
- R
- What is the precedence code for an immediate message?
- O
- What is the perecedence code for a priortiy message?
- P
- What four characters are used to identify an unclassified message?
- UUUU
- What four characters are used to identify top secret messages?
- TTTT
- What four characters are used to identify secret message?
- SSSS
- How many precedence categories are there?
- 4
- What is the date time group for a message that was released on 2 FEB 2005 at 1505 Zulu?
- 021505Z FEB 05
- What is the first word of the message text?
- Security designation
- What is the information that is put in the security classification time of executive orders?
- For official use only
- Who is authorized to suspend unclassified message procedures if operational neccesity details?
- CO
- What level of maintenance provides engineering and technical support?
- DEPOT
- What level of amintenance provides the day to day upkeep on equipment?
- Organizational
- At aminimum of how often will all aircraft compasses be calibrated?
- yearly
- You are assigned to a squadron that is scheduled for a six month deployment, how many days prior to deployment must your aircraft compasses be calibrated?
- 90
- If you request a deviation for a compass calibration who must approve it?
- ACC/TYCOM
- What logbook form do you log compass calibration on if it's performed on the prescribed interval?
- scheduled INSP
- Compass calibration cards shall be displayed in?
- Aircraft
- Where will a copy of the compass calibration be filed in the aircraft logbook?
- Manila envelope
- What division is responsible for all calibration?
- Avionics
- Support equipment shall not be transferred in a non RFI status without approval from whom?
- COGNIZNT SECA
- The planned maintenance system deviation on SE is?
- + or - 3 days or + or -10%
- You are responsible for running the SE PMS program in your squadron you depresserve a piece of SE are you required to do mmissed PM's?
- yes
- What is the form number of a SE rework schedule request?
- OPNAVFORM 4790/80
- What is the form number for customer service work request on SE?
- OPNAVFORM 4790/36A
- What is the form number for an aeronautical equipment service record?
- OPNAVFORM 4790/29
- What is the form number for SE transaction report?
- OPNAVFORM 4790/64
- The concept of QA is the prevention of the occurance of defects? True or False
- true
- What listing is used to provide for effective management of SE?
- AMMRL
- What listing governs all technical directive (TD) compliance on aircraft and engines?
- NA 00-500C
- What manual governs the TD program?
- NA 00-25-300
- What listing reflects all applicable TD's to a specific assigned aircraft or engine?
- NA 00-500C
- What form is used to request formal TD's?
- DD 1348
- What TD list can replace aircraft to pages?
- List 02 and 04
- What TD list is the applicability list?
- List 01
- What TD list is the TD not incorparated list?
- List 02
- What TD list is the TD INC/NINC summary?
- List 03
- What TD list is the TD inc listing?
- List 04
- What TD list is the TD history list?
- List 04H
- How often does the TD list 04H come out?
- annually
- How often does the TD list 01 come out?
- Semi annual
- How often does the TD list 02 come out?
- Monthly
- How often does the TD list 03 comeout?
- quarterly
- How often does the TD list 04 come out?
- quaterly
- Who recieves the TD list 01?
- Reporting custodian and WING/MALS
- Who recieves the TD list 02?
- Reporting custodian
- Who recieves the TD list 03?
- WING/MALS
- Who recieves the TD list 04?
- Reporting custodian
- Who recieves the TD list 04H?
- Reporting custodian
- How many days after receipt of new listings 02 & 04 are errors and omissions required to be submitted to the TDSA program manager?
- 30
- Whta is teh status code for pinc TD's on list 02 & 04?
- P
- What is the status code for inc TD's on list 02 & 04?
- C
- What is the status code for does not apply TD's on list 02 & 04?
- D
- How often is the TD listing 04H verified?
- annual
- What are the two classifications of aircraft weight and balance?
- 1 & 2
- What form number is the record of weight and balance?
- DD Form 365
- What is the form number for chart "A"?
- DD Form 365-1
- What is the form number for form "B"?
- DD FORM 365-3
- Who must verify the use of the does not apply status code?
- QA
- what is the form number for chart "C"?
- DD FORM 365-4
- What is the form number for form "F"?
- DD FORM 365-4
- What form is used for the documentation of record of weight and balance personnel?
- Dd FORM 365
- What form is used for the documentation of basic weight and balance?
- DD FORM 365-1
- What form is used for the documentation of aircraft weighing record?
- DD FORM 365-2
- what form is used for the documentation of weight and balance clearance form?
- DD FORM 365-4
- What instruction covers aircraft preservation?
- NA 15-01-500
- The responsibility of maintenance control is to manage resources in an efficent manner True or false
- True
- Whose job is it to provide quantitive analytical information?
- SA/A
- If operating with VIDS what work center will the data analyst be assigned to?
- 04C
- What is the form number for aircraft inspection and acceptance record?
- OPNAV 4790/141
- How many previous flights worth of discrepancies shall the pilot in command review prior to flight?
- 10
- Are turnaround inspections required for aircraft participated in hot seat evolutions?
- NO
- When is an FCF requried?
- Acceptance, aircraft no fly for 30 days
- Who must authorize that an FCF can be flown along with an operational mission?
- CO
- If your aircraft is on a phase interval of 200 HRS and you perform the phase at 215 hours when is the next phase inspection due?
- 400
- What is the deviation period for a 14 day special inspection?
- + or -3 days
- What is the deviation period for an 800- hour inspection?
- 80 HRS
- Who is responsible for holding a pre-phase meeting?
- MMCO
- What is the form number for preflight\ daily\ turnaround\ post flight documentation?
- OPNAV 4790/38
- How many hours is a turnaround inspection valid for?
- 24
- How many hours is a daily inspection valid for?
- 72
- What kind of inspection is a 10 CAT inspection?
- Special
- What is the deviation for a 10 CAT inspection?
- + or - 10%
- What kind of inspection is performed in the event of a hard landing?
- conditional
- What kind of inspection inspects a specific area of an aircraft?
- Zonal
- What kind of inspection is performed at the time a reporting custodian recieves a newly assigned aircraft?
- Acceptance
- You are assigned to VRC-30, are you required to do an acceptance or transfer inspection when a detachment is deploying?
- NO
- How many days prior to aircraft transfer is the aircraft required to have been flown?
- 10
- What status is an aircraft required to be in prior to transfer?
- FMC
- What status is an aircraft requred to be in prior to transfer?
- FMC
- What logbook form do you log acceptance/transfer inspections on?
- conditional
- What is the form number for a support equipment operations license?
- OPNAV 4790/102
- What is the form number for a support equipment pre-operational inspections?
- OPNAV 4790/52
- Who is responsible for the drafting of the MMP?
- MMCO
- What day of the month is the MMP required to be out in an "O" Level activity?
- 25
- What day of the month is the MMP required to be out in an "I" level activity?
- 30
- What form is used for standard depot level work request?
- OPNAV 4790/65
- What is the report number for the equipment master roster?
- E-00
- What priority code is assigned to activities that are deploying within 30 days?
- 1
- What division screens all incoming parts to check if the component is within check, test or repair capability of the AIMD?
- AMSU
- You are told by the maintenance chief to issue a phase "B" inspection MAF. What JCN do statrt with on the mother MAF?
- BOO
- I?n the JCN block of a MAF what level maintenance is the only that uses the suffix?
- I
- What system is used to monitor mission capability on selected systems and sub systems?
- SCIR
- What is a structural three digit code that relates to a particular system/ subsystem?
- EOC
- What is misson capability code A-799?
- No defect
-
The correct formula for SC
IR is AWM+EMT+AWP=SCIR TRUE or FALSE - true
- If maintenance is not currently impacting system capability what EOC is to be used?
- A
- If no QA is available during transient maintenance who is authorized to sign as inspector?
- PILOT in command and designated qualified member
- Unscheduled corrosion prevention man hours will be reported only if the elapsed maintenance time exceeds how many hours?
- .75 man hours
- What TR code is used when there is no change in part number from the incorparation of a technical directive?
- 41
- What TR code is used when there is a change in part number from the incorpation of a technical directive?
- 47
- What manual is used for preservation of support equipment?
- NA 15-01-500 and NA 17-1-1
- What is the inventory code you will use for support equipment?
- 0
- How often is the equipment master roster published?
- quarterly
- 135A
- MODULE SERVICE RECORD (MSR)
- 27A
- INVENTORY RECORD
- 113A
- EHR
- 106A
- ASR
- 29
- AERONAUTICAL EQUIPMENT SERVICE RECORD (AESR)
- 25A
- MISCELLANEOUS/HISTORY
- 102
- SE OPERATORS LICENSE
- 101
- ALSS; PARACHUTE RECORD
- 24A
-
TECHNICAL DIRECTIVES
- 26A
- INSTALLED EXPLOSIVES DEVICE RECORD
- 22A
- INSPECTION RECORD
- 28A
- SCHEDULE REMOVAL COMPONENT (SRC)
- 141
- AIRCRAFT INSPECTION AND ACCEPTANCE RECORD
- ACB
- 67
- ACC
- 66
- SEC
- 62
- AAC
- 56
- AFB
- 74
- AYB
- 58
- AYC
- 61
- AVB
- 55
- AVC
- 54
- AAB
- 57
- AFC
- 50
- 21A
- MONTHLY FLIGHT SUMMARY
- 142
- STRUCTURAL LIFE LIMITS
- 23A
- REPAIR/REWORK
- 31A
- EQUIPMENT OPERATING RECORD (EOR)