MAYNARD
Terms
undefined, object
copy deck
- E3 IS DEFINED AS
- ENVIORMENTAL EFFECTS CLASSIFIACTION CODE
-
E3 LETTER
X - SPECIAL PURPOSE IE PULSE OR RF PWR
-
E3 LETTER
E - EMITS INTERFERENCE
-
E3 LETTER
P - CARRYS ELECTRICAL POWER
-
E3 LETTER
S - SUSCEPTIBLE TO INTERFERENCE
-
E3 LETTER
Y -
PASSIVE:
DOSENT EMIT NOR IS IT SUSPECTIABLE TO INTERFERENCE -
CABLE MARKINGS
DIRECT - FACTORY WIRE #'S EVERY 3 INCHES ALONG THE ENTIRE LENGHT OF WIRE
-
CABLE MARKINGS
IN-DIRECT - HEAT SHRINK PLACED ON TEH WIRE 12 INCHES FROM TERMINATION ADN AT 3 FEET THROUGH OUT THE ENTIRE LENGTH OF WIRE
- HOT STAMPING
- HOT STAMPING IS MARKING DIRECTLY ONTO THE WIRE AND IS NOT UTHORIZED FOR ANY APPLICATION.
- WHAT IS THE BRADY MARKING SYSTEM
- BMXC-PLUS IS A PORTABLE PRINTER SELF CONTAINED DOT MATRIX LABELING SYSTEM,
- WHAT IS THE HEAT SHRINK RATIO OF THE BRADY-LABELING PRINTER?
- 2:1 AT 300 DEGREES F, AND SERVICEABLE TO -40 F
- WHAT IS THE BRADY LS2000
- PORTABLE SELFCONTAINED HIGH RESOLUTION SHUTTLE HEAD PRINTER.
- LS2000 UTILIZES WHAT TYPE OF BATTERY
- LITHUIM CELL
- WHAT ARE THE TWO TYPES OF HARNESSESS?
-
OPEN- ALOWS FOR VISUAL INSPECTION
PROTECTED- CLOSED BY A COVERING OF LIGHT WIRE. - WHAT IS THE CLEARENCE REQUIRED FOR RUOTING WIRES PARRALLE TO FLAMABLE LINES?
- YOU MUST MAINTIAN 1/2 CLEARENCE AT ALL TIMES
-
WIRES IN A CONDUCT
ARE SPLICES ALLOWED - NO SPLICES ARE NO ALLOWED, NEITHER ARE TIE POINTS
-
WIRE IN A CONDUCT
AT WHAT PSI CAN YOU BLOW STRING THROUGH - NEVER USE MORE THEN 35 PSI TO BLOW STRING A CONDUCT.
-
WIRES IN A CONDUCT
WHAT IS THE MAXUIM BEND RADIUS FOR ANY WIRE - THIS PERTAINS TO COAXIAL CABLE ONLY AND THE MAXIUM IS 6X'S THE OUTSIDE DIAMETER.
-
WIRES IN A CONDUCT
WHAT IS THE REQUIREMENT FOR CHAFE TAPE? - 3/8S INCH SEPERATION CANNON T BE MAINTAINED THEN ALL EDGES SHALL BE POTECTED WITH CHAFE TAPE
- ZIP TIES CANNOT BE USED IN WHAT CONDITIONS.
-
TEMP EXCCESDS 185 F
COAXIAL CABLES
HIGH VIB AREAS
SWAMP AREAS
INSIDE BUNDLES OR HARNESSESS - CORROSION IS DEFINED AS
- THE ELECTROCHEMICAL DETERIORATION OF A MATERIAL OR ITS PROPERTIES DUE TO ITS CHEMICAL REATCION WITH THE SURROUNDING AREA
- WHAT ARE THE 4 CONDITIONS THAT MUST BE MET INORDER FOR A MATERIAL TO CORRODE
-
METAL THAT HAS A TENDECY TO COORRODE MUST BE PRESENT,
DISSIMILAR CONDUCTIVE MATERIAL, CONDUCTIVE LIQUID,
ELECTRICAL CONTACT. -
TYPES OF CORROSION
UNIFORM - A DIRECT CHEMICAL ATTACK ON THE SURFACE THAT PROCEEDS UNIFOMLY OVER THE ENTIER SURFACE
-
TYPES OF CORROSION
GALVANIC - IS THE SAME AS DISSIMULAR METAL RECONGNIZABLE AT THE JOINTS BETWEEN DIFFERENT METALS
-
TYPES OF CORROSION
PTTING - AN EXTREMELY LOCALIZED ATTACK THAT RESULTS IN HOLES IN THE METAL. PITTING IS USUALLY DECTED AS A GRAY POWDER SIMILUAR TO DUST
-
TYPES OF CORROSION
INTERGRANNULAR - AN ATTACK ON THE GRAIN BOUNDRYS OF THE METAL, ALLUIMIN IS HIGHLY SUSPECTABLE.
-
TYPES OF CORROSION
EXFOLIATION - IS AN ADVANCED FORM OF INTERGRAINULAR WHERE THE FORCE OF EXPANDING CORROSION FORCES UP THE LAYERS OF THE METAL AFFECTED.
-
TYPES OF CORROSION
CREVICE - OCCURS WHERE STANGET SOULTIONS IS POOLED UP, USUALLY AROUND GASKETS, CAP JOINTS OR RIVETS.
-
TYPES OF CORROSION
OXYGEN DIFFRENTIAL CELL - ANY PLACE OXYGEN IS NOT ALLOWDE TO DEFUISE INTO THE SOLUTION.
-
TYPES OF CORROSION
FILFORM - A FORM OF CREVICE CORR, WHICH OCCURS ON METAL SURFACES WITH A THIN ORGANITIC COATING, LEAVES WORM LIKE TRACE DEPOSITS ON THE SURFACE
-
TYPES OF CORROSION
ERROSION -
MOVEMNET OF CORROSION, CHARATIZED BY GROVES, GULLIES, WAVES, ROUNDED HOLES,
AND OR VALLEYS -
TYPES OF CORROSION
STRESS - IS THE INTERGRAINULAR OR TRANSGRAINULAR CRACKING OF A METAL CAUSED BY THE COMBINED EFFECTS OF STRESS AND CORROSION.
-
TYPES OF CORROSION
FRETTING - OCCURS AT THE CONTACT AREAS BETWEEN MATERIAL UNDER A LOAD AND SUBJECT TO REPEAT VIBRATIONS.
-
TYPES OF CORROSION
HOT CORROSION / HIGH TEMP OXIDATION - IN THE ABSENCE OF WATER CAN OCCUR HIGH TEMPS SUCH AS THOSE IN TURBINE AREAS.
-
EFFECTS OF CORROSION
MAGNESIUM - PITTING
-
EFFECTS OF CORROSION
CARBON/LOW ALLOY STEEL -
SURFACE OXIDATION/ PITTING
/INTERGRAINULAR -
EFFECTS OF CORROSION
STAINLESS STEEL - CREVICE/ PITTING/ CRACKING/ INTERGRAINULAR/ SURFACE
-
EFFECTS OF CORROSION
TITANIUM - HIGHLY RESETIANT TO ALL CORROSIONS
-
EFFECTS OF CORROSION
CADIUM - UNIFORM SURFACE CORROISON
-
EFFECTS OF CORROSION
CHROMIUM -
PITTING
RUST INSIDE THE PITTING -
EFFECTS OF CORROSION
NICKLE - PITTING INSIDE SEA WATER
-
EFFECTS OF CORROSION
ELECTROLESS NICKLE - PITTING OR FLACKING OF PLATING
-
EFFECTS OF CORROSION
COPPER BASED ALLOYS/ BRASS / BRONZE - SURFACE AND INTERGRANULAR
-
EFFECTS OF CORROSION
SILVER - WILL TARNISH IN THE PRESENT OF SULFER
-
EFFECTS OF CORROSION
TIN - SUBJECT OF WISKER GROWTH
-
APPEARNCE OF CORROSION
ALUMINUM ALLOY - WHITE TO GRAY POWDER
-
APPEARNCE OF CORROSION
MAGNESIUM - WHITE POWDERLY, SNOWLIKE MOUNDS AND WHITE SPOTS ON SURFACE
-
APPEARNCE OF CORROSION
CARBON/LOW ALLOY STEEL -
REDISH BROWN POWDER
RUST -
APPEARNCE OF CORROSION
STAINLESS STEEL -
ROUGH SURFACE, RED/BROWN/BLACK
STAIN -
APPEARNCE OF CORROSION
TITANIUM - NONE
-
APPEARNCE OF CORROSION
CADIUM - WHITE POWDERLY TO BROWN OR BALCE MOLTING
-
APPEARNCE OF CORROSION
CHROMIUM - BLISTERING OF PLATING
-
APPEARNCE OF CORROSION
NICKLE - GREEN POWDER
-
APPEARNCE OF CORROSION
ELECTROUS NICKLE - FLAKING OF PLATING
-
APPEARNCE OF CORROSION
COPPER BASED ALLOYS, BRASS, BRONZE - BLUE OR BLUE GREEN POWDER
-
APPEARNCE OF CORROSION
SILVER - BROWN TO BLACK FILM
-
APPEARNCE OF CORROSION
TIN - WHISKER LIKE DEPOSITS
-
NAVAIR 17-15BAD-1 / LEAD ACID
AMP HOURS ARE DEFINED AS -
UNIT OF MEASUREMENT THE REFER S TO THE ELECTRICAL CAPACITY OR THE BATTERY
AMP*TIME=POWER -
NAVAIR 17-15BAD-1 / LEAD ACID
CELL VOLTAGE - 2.1 TO 2.2 VOLTS
-
NAVAIR 17-15BAD-1 / LEAD ACID
OVERCHARGING A SLAB WILL RESULT IN WHAT - VENTING WICH WILL EVENTLY DRY OUT THE CELL RESULTING IN A DECREASED CAPACITY AND BATTERY FAILURE.
-
NAVAIR 17-15BAD-1 / LEAD ACID
UNDERCHARGING WILL RESULT IN WHAT? - WITH 24HOURS AT ZERO CHARGE THE BATTERY IS PEREMNTLY DAMAGED
-
NAVAIR 17-15BAD-1 / LEAD ACID
SLAB ELECTROLIGHT - MIXTURE OF SULFURIC ACID AND WIATER IN A GEL
-
NAVAIR 17-15BAD-1 / LEAD ACID
CUT OFF VOLTAGE - NEAR VOLTAGE EXHASUSTING WHERE THE POWER STARTS TO DROP OFF SHARPLY
-
NAVAIR 17-15BAD-1 / LEAD ACID
CONSTANT POTENTIAL METHOD OF CHARGING IS DEFINES AS? - A CHARGE SOURCE APPLIED TO A FIXED VOLTAGE THAT ALLOWS FOR THE CURRENT TO FLUX WITH THE BATTERY CHARGE.
-
NAVAIR 17-15BAD-1 / LEAD ACID
CONSTANT CURRENT CHARGE METHOD IS DEFINED AS? - A CHARGE SOURCE WHERE ALL BATTERIES RECEIVE THE SAME AMOUNT OF CURRENT.
-
NAVAIR 17-15BAD-1 / LEAD ACID
WHO IS RESPONSIBLE FOR ENSURING ALL BATTERY TECH RECEIVE 40 HOURS OF TRIANING - AVIONCS OFFICER IS RESPONSIBLE
-
NAVAIR 17-15BAD-1 / LEAD ACID
WHAT IS THE SUDSY SOLUTION ISED TO CLEAN BATERY TERMAINLS - 6.0 OZ SODIUM BICARBONATE TO 1 GAL OF WATER
-
NAVAIR 17-15BAD-1 / LEAD ACID
WHY SHOULD YOU NOT OVERCHARGE A SLAB? - SLABS HAVE A TENDENCY TO OVERHEAT WHEN IN ANOVERCHARGED STATE DO NOT ALLOW A SLAB TO EXCEED 105 F
-
NAVAIR 17-15BAD-1 / LEAD ACID
WHAT IS THE FORMAT OF PLACED IN SEVICE DATE (PIS) -
FORMAT IS MMMYY
FEB06 -
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
HOW SHOULD YOU MIX ACID AND WATER? - ALWAYS POUR ACID INTO THE WATER IN A HARD RUBBER OR PLASTIC CONTAINER.
-
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
HYDROMETER - IS USED TO DETERMINE THE SPECIFIC GRAVITY OF THE ELECTROLYTE
-
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
WHEN IS THE HYDRO REDING RELABLE? - THE REDING IS ONLY RELABLE AFTER THE MIXTURE IS THROUGHT MIXED. READING TAKEN DIRECTLY AFTER MIXING ARE UNREALIABLE.
-
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
A FULLY CHARGED BATTERY WILL HAVE A SPECIFIC GRAVETY OF? - SOMEWHERE BETWEEN 1.275 AND 1/295 BUT NO ABOVE 1.306
-
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
WHAT IS THE CHEMICAL EQ FOR A CHARGED BATTERY - PB+PBO2+2H2504
-
NAVAIR 17-15BAD-1 / LEAD ACID
VENTED
WHAT IS THE CHEMICAL EQ FOR A DISCHARGED BATTERY - 2PBS04+2H20
- WHAT IS THE MIN SEPERATION REQUIRED BETWEEN LEAD ACID AND NICAD BATTERIES
- 3 FEET
- HOW LONG SAHLL BATTERY RECORDS BE MAINTAINED
- 4 YEARS
- BATTERY RECORDS SHALL SHOULD CONTAIN WHAT INFORMATION
-
TYPE OF BATTERY
MANUFACTURE
PIS DATE
CHARGING INFORMATION
TEMP READING
CAP TEST RESULTS - WHAT IS THE SLAB SERVICE RECORD FORM NUMBER
- ATFO FORM 161
- WHAT DOES A HEATER BALMKET CIRCUIT TEST CHECK?
- IT CHECKS TO SEE IF ANY OF THE THERMAL SWITHCES ARE STUCK CLOSED
- WHAT IS THE FORM NUMBER OF THE BATTERY TEST RECORD.
- NON-MSD-970-1
- WHAT DO YOU DO WITH A BATTERY THAT HAS EXCEEDED ITS LIFE EXPECTY BUT STILL PASSES IT'S CAP TEST?
- USE THE BATTERY FOR NAVAL SUPPORT EQ.
- WHAT ARE THE TWO TYPES OF BASIC METERING POWER SOURCES
-
SELF-EXCITED
EXTERNALLY EXCITED - HOW IS A SELF-EXCITED METER POWERED.
- SELF-EXCITED METER IS POWERED BY IT'S OWN POWER SOURCE IE A BATTERY
- HOW IS A EXTERNALLY-EXCITED METER POWERED.
- EXTERNALLY EXCITED METERS ARE POWERED THROUGH THE CIRCUIT THEY ARE CONNECTED TO.
- WHAT IS THE BASIC METER MOVEMENT?
- THE BBASIC METER MOVEMENT IS A STANTIONARY, PERMENT, MAGNET, MOVING COIL METER.
- WHAT IS A GALVANOMETER?
- IT IS A METER THAT IS USED TO MEASURE VERY LOW VOLTAGES IT IS AN EXAMPLE OF THE BASIC METER MOVEMENT IN ACTION.
- WHAT PHYSCIAL COMPONENT OF THE GALVANOMETER PROVIDES THE RESTORING FORCE FOR THE COIL?
- THE THIN FLAT RIBBONS MADE OF PHOSPHOR BRONZE.
- IN A GALVANOMETER WHAT TWO METHODS ARE USED TO INDICATE THE AMMOUNT OF COIL ROTATION?
- THE POINTER ARRANGEMENT AND THE LIGHT AND MIRROR ARRANGEMENT.
- WHAT IS THE PRIMARY DISSADVANTAGE OF THE POINTER ARRANGMENT?
- IT INTRODUCES A MECHNICAL COIL BALANCING PROBLEM ESPECIALLY IF THE POINTER IS LONG.
- WHAT IS THE DIFFERENCE BETWEEN THE "GALVANOMETER" AND THE "D'ARONAVAL METER"
- THE D'VARSONAL METER THE LENGHT OF THE CONDUCTOR AND THE STRENGHT OF THE FIELD BETWEEN THE POLES OF THE MAGNET ARE FIXED. THEREFORE ANBY CHANGE IN CURRENT CAUSES A PROPORTIONAL CHANGE IN THE FORCE ACTING ON THE COIL.
- WHAT COMPONENT SUIPPLIES THE RESTORING FORCE TO THE COIL OF THE DVARSONAL METER?
- THE HAIR SPRING COIL PROVIDE STHE RESTORING FORCE.
- WHAT DOES DAMPING PREVENT
- DAMPING PREVENT THE POINTER FROM OSCILLATING. IT IS AN ENRGY ABSORBING SYSTEM.
- HOW IS DAMPING ACCOMPLISHED IN A DVARSONAL METER?
- IT IS ACCOMPLISHED IN THE ALUMINUM BOBBINS ON WHICH THE COIL IS WOUND.
- WHAT IS A SHUNT IN REALATION TO METERS
- A SHUNT IS A PHYSICALLY LARGE , LOWW RESESTANCE CONDUCTOR CONNECTED IN PARALLEL WITH THE METER TERMINALS IT IS USED TO CARRY THE MAJORITY OF THE CURRENT LOAD. IT PREVENTS DAMAGE TO THE METER.
- WHAT TYPE OF TEMPETTURE CO-EFFECIENT MATERIAL DOESN'T PRODUCE AN INCREASSED HEAT IN RESPONCE TO INCREASES CURRENT FLOW?
- ZERO TEMPETURE CO-EFFECIENT.
- A GOOD CHOICE OF SHUNT RESITENCE WILL PLACE THE INDICATING POINTER NEAR THE WHAT PART OF THE METER.
- THE MIDDLE.
- HOW DO YOU CONNECT AN AMMETER IN A CIRCUIT?
- YOU ALWAYS CONNECT AN AMMETER IN SERIES
- AN AMMETER SHALL ALWAYS BE CONNECTED SO THAT CURRENT WILL FLOW INTO WHAT TERMIAL FROM WHAT TERMINAL.
- INTO THE NEGITAVE AND OUT OF THE POSTIVE TERMIANLS OF THE CIRCUIT.
- (TRUE OR FALSE) THE LARGER THE CURRENT REQUIRED TO PRODUCE A FULL-SCALE DEFLECTION OF THE METER COIL, THE BETTER THE SENSITIVITY IOF THE METER?
- FALSE THE SMALLER AMOUNT OF CURRENT NEEDED, IS WHAT WILL PRODUCE THE GREATEST SENSITIVITY IN A METER.
- WHAT MODIFICATION IS MADE TO THE DVARSONAL METER TO ENABLE IT TO CHECK VOLTAGE?
- A MULITPLIER IS PLACE IN SERIES WITH THE MOVING COIL OF THE METER.
- HOW DO YOU CONNECT A VOLTMETER IN A CIRCUIT?
- YOU ALWAYS CONNECT THE VOLTMETER IN PARALLEL
- WHAT KIND OF INSTURMENT IS USED TO MEASUE THE INSULATION RESTENCE OF A CABLE?
- A MEGGER OR MEGOHMETER
- WHAT ADDED FEATURES ENABLE A VOLTMETER TO ACT AS AN OHMETER?
- A SOURCE OF DC POTENTIAL AND ONE OR MORE RESISTORS (ONE OF WHICH SHALL BE A VARAIBLE.)
- A FULL-SCALE DEFELECTION ON A OHM METER MEANS WHAT?
- THAT THERE IS ZERO RESISTANCE BETWEEN THE LEADS OF THE METER.
-
BASIC METERS
OHMMETERS: MOVEMENT OF THE COIL IS PROPORTIONAL TO WHAT? - MOVEMENT OF THE COIL IS PROPORTIONAL TO THE AMOUNT OF CURRENT FLOW
-
BASIC METERS
OHMMETERS: THE SCALE OF THE READING IS INVERSELY PROPORTIONAL TO WHAT? - THE SCALE OF THE READING IS INVERSELY PROPORTIONAL TO THE CURRENT FLOW IN THE MOVING COIL.
- WHAT ARE THE TWO DIFFERENT TYPES OF MEGOHMETERS
- A HAND DRIVEN MODEL AND A DIGITAL METER.
- WHAT IS THE PURPOSE OF THE GUARD RING IN A MEGOHMMETER.
- IT SHUNTS ANY LEAKAGE CURRENT TO THE NEGATIVE SIDE OF THE GENERATOR, THIS PREVENTS SUCH CURRENT FROM FLOWING THRUGH COIL A AND AFFECTING THE METER.
- WHAT ARE MOST MEGGERS RATED IN VOLTAGE?
- 500 VOLTS
- WHAT COMPONNET PREVENTS THE GENERATOR SPEED AND OUTPUT VOLTAGE FROM EXCEEDING RATED VALUES?
- FRICTION CLUTCH PREVENTS EXCEEDING THE VOLTAGE VALUES.
- HOW DO CONNECT A WATT METER IN A CIRCUIT?
- YOU ALWAYS CONNECT THE WATT METER IN SERIES WITH THE LOAD.
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
AT WHAT AMP RATING ARE SHOCKS USUALY FATAL. - .1 AMPS IF THE SHOCK LAST FOR MORE THEN 1 SECOND
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
ELECTRICAL FIRES
CLASS A WHAT IS THE TYPE OF FUEL - WOOD, PAPER , COTTON, WOOL FABRICS, CORK AND SO FORTH THAT IT LEAVES AMBERS OR ASH
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
ELECTRICAL FIRES
CLASS B WHAT IS THE TYPE OF FUEL - COOKING AND FUEL OILS, GASOLINE, JET FUELS ETC.
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
ELECTRICAL FIRES
CLASS C WHAT IS THE TYPE OF FUEL - ELECTRICAL IN ORGINAND MAY INVOLVE FUELS FORM A/B/D CATEGORIES
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
ELECTRICAL FIRES
CLASS D WHAT IS THE TYPE OF FUEL - SPECIAL METAL ALLOYS OF MAGNESIUM TITANIUM ZINC AND SO FORTH
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT SHOULD YOU NEVER USE WHEN FIGHTING A CLASS C FIRE? - A STEADY STREAM OF WATER.
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT SHOULD YOU HAVE A PERSON DRINK IF HE/SHE DRANK GASOLINE? - LARGE AMOUNTS OF MILK OR WATER AND 4 TABLESPOONS OF VEGETABLE OIL.
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHO IS RESPONSIBLE FOR SAFETY? - ALL HANDS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT PRECAUTION SHOULD YOU TAKE PRIOR TO REMOVING A FUSE? - DE-ENERGIZE THE CIRCUIT
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS REQUIRED FOR SOMEONE TO PERFORM CPR - CERTIFIED CPR TRAINING
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHERE CAN YOU FIND THE DANGER AREAS OF A PARTICULAR AIRCRAFT? - MIM
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHO SHOULD STAND BY WHILE WORKING ON LIVE SYSTEMS - SOMEONE QUALIFIED TO RENER FIRST AID
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT CRITERION DETERMINES SHOCK SEVERITY - CURRENT
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHICH TOOLS SHALL NOT BE ETCHED? - COPPER BERYLLIUM TOOLS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE PREFERED EXTINGUISHING AGENT FOR ELECTRICAL FIRES? - CO2
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE MAXUIM PSI OF COMPRESSED GAS USED FOR CLEANING EQUIPMENT? - 30
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT ARE THE 2 BROAD CATEGORIES OF MAINTENANCE? - SCHEDULED AND UNSCHEDULED
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
SCHEDULED MAINTENANCE INCLUDES WHAT TYPES OF CHECKS? - VISUAL CHECKS, CLEANING, LUBRICATION, AND PM CHECKS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT OLD MANUAL WOULD YOU UTILIZE FOR AVIONICS CORROSION TESTING. - NA-16-1-540
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT ARE THE TWO BROAD CATEGORIES OF MAINTENANCE? - SCHEDULED AND UNSCHEDULED MAINTENANCE
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE PRIMARY PURPOSE OF PREVENTIVE MAINTENANCE? - MAINTENANCE PREFORMED TO REDUCE THE LIKELIHOOD OF FUTER TROUBLES OR MALFUCTIONS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE FIRST STEP YOU SHOULD TAKE WHEN RECEIVING A DISCREPANCY? - DETERMINE IF THE EQUIPMENT IN QUESTION IS ACTUALLY FAULTY
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318 - TO CHECK FOR OPENS OR TO SEE IF A CIRCUIT IS COMPLETE IF CONTINUOUS.
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
DESCRIBE THE DIFFERENT METHODS OF CHECKING SHORTS IN TRANSFORMERS, WINDINGS, AND CAPACTORS - THE MAJOR METHOD FOR TESTING THESE COMPONENTS IS TO TAKE RESISTANCE MEASUREMENTS AND COMPARE THEM WITH SCHEMATICS AND MIMS OR IDENTICAL COMPONENTS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE EFFECTIVE METHOD FOR LOCATING DEFECTIVE EQUIPMENT - SIGNAL TRACING METHOD
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
USE OF IMPROPER TEST PROBES MAY RESULT IN WHAT? - DISTORED WAVESHAPE OF THE OBSERVED SIGNAL
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT SHOULD BE DONE PRIOR TO MAKING RESISTENCE READINGS? - ENSURE NO VOLTAGES ARE PRESENT
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
AFTER COMPLETE REASSEMBLY OF EQ, WHAT MUST BE DONE? - OPERATIONAL CHECKS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT MUST BE CONSIDERED WHEN SUBSTITUTING A RESISTOR? - OHMIC VALUE, WATTAGE RATING, TOLERANCE, PHYSICAL DIMENSIONS AND TYPE OF CONSTRUCTION
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE PROPER COLOR CODE FOR A 100 OHM RESISTOR WITH A 10 PERCENT TOLERANCE -
1ST BAND BROWN
2ND BAND BLACK
3RD BAND BROWN
4TH BAND SILVER -
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHERE SHOULD YOU LOOK FOR WIRE REPLACING INFORMATION - AIRCRAFT MIMS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT TYPE OF WIRE IS USED TO CARRY 600-1000 VOLTS AT 302-500 F - MIL-W-22759
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHEN STAMPING WIRE ID NUMBERS AT WHAT INTERVALS SHOULD YOU STAMP? - 15 INCHES MAXIMUM
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT DOES THE SUFFEX "N" STAND FOR IN WIRE ID? - WIRE OR CABLE THAT COMPLETES THE CIRCUIT TO GROUND
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE MINIMUM SLACK REQUIRED WHEN A WIRE IS TERMINATED AT A CONNNECTOR? - 1 INCH
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHY IS SPOT TIE USED ON COAXAIL CABLES? - PREVENT DAMAGE TO CABLE INSULATION
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT PUB CONTAINS INFORMATION ON MOUNTING HARDWARE FOR AIRCRAFT PARTS? - STRUCTURAL HARDWARE MANUAL NA-01-1A-8
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT FACTORS MUST BE CONSIDERED WHEN SUBING HARDWARE? - CORROSION, STRENGH, SIZE, LENGHT, MAGNETIC PROPERTIES, SPECIAL FEATURES AND LUBRICATION OR COATING
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE ONLY REASON FOR CLAMPING A WIRE BUNDLE OT A PLUMBING LINE? - TO SEPERATE THE WIRE BUNDLE FROM THE PLUMBING LINE
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT LETER ID A TERMAINL BOARD - TB
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE PURPOSE OF LOCE WIRE? - TO PREVENT ACCIDENTAL LOOSING OF AIRCRAFT EQUIPTEMTN AND CONNECTORS DUE TO VIBRATION
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE MEAING OF "WRA" - WEAPONS REPLACEABLE ASSEMBLY
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHO IS AUTHORIZED TO MAKE SOLDERING REPAIRS - CERTIFIED 2M TECHS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT SHOULD USE TO DETERMINE THE MAINTENANCE LEVEL FOR REPAIR OF A DEFECTIVE ASSEMBLY - S,M AND R CODES
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
ESD-SENSITIVE DECIVES CAN BE DAMAGED BY ELECTROSTATIC VOLTAGES AS LOW AS HOW MANY VOLTS? - 20 VOLTS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHEN HANDLING ESDS DEVICES PERSONNEL AND THEIR APPAREL SHOULD BE ATTACHED TO WHAT? - GROUND
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT IS THE MINIUMIM RESISTENCE FOR PERSONNEL GROUNDING STRAPS? - 250,00 OHMS
-
MAINTENANCE TROUBLESHOOTING
AMR CHAPTER FIVE 14318
WHAT COLOR MATERIAL IS ANTISTATIC? - PINK
-
509-2 CHAPTER 9 EMG PROCEDURES
PERMISSION MUST BE OBTIANED FROM WHO PRIOR TO INITIATION OF EMGERGENCY PROCEDURES - THE SENIOR MEMBER OF THE ACCIDENT INVESTIGATION BOARD
-
509-2 CHAPTER 9 EMG PROCEDURES
WHO SHALL SUPERVICE THE REMOVAL OF EQUIPTMENT - AMO
-
509-2 CHAPTER 9 EMG PROCEDURES
WHO SHALL PREPARE OF HAVE ACCESS TO THE PRIORTY LISTING OF EQUIPTMENT - MAINTENANCE OFFICER
-
509-2 CHAPTER 9 EMG PROCEDURES
PRIMARY CLEANING METHOD FOR SALT WATER IS: -
IMERSE IN CLEAN WATER
FLUSH WITH FRESH WATER
DRY COMPONENT
REPEAT AS REQUIRED -
509-2 CHAPTER 9 EMG PROCEDURES
WHEN IS THE ALTERNATE METHOD OF CLEANING UTILIZED? - WHEN THERE IS NO ACCESS TO FRESH WATER
-
509-2 CHAPTER 9 EMG PROCEDURES
WHAT IS THE PREFERED ALTERNATE METHOD FOR SALT WATER CLEAN UP - SPRAY, WIPE, OR BRUSH ON EXTERIOR OF AFFECTED AREAS WITH LIBERAL AMOUNTS OF CPC-TYPE 2
-
509-2 CHAPTER 9 EMG PROCEDURES
WHAT IS THE CHEMICAL MAKE UP PKP AND WHAT COLOR IS THE BAND ON THE BOTTLE? -
THE CHEMICAL MAKE UP IS
POTASSIUM BICARBONATE, SINCE IT IS A PURPLE COLORED POWDER IT IS MARKED WITH A PURPLE BAND. -
509-2 CHAPTER 9 EMG PROCEDURES
TRUE OR FALSE TO REMOVE AFFF YOU MIX 1 PINT AFFF AND 10 GALLONS OF FRESH WATER. - TRUE
-
509-2 CHAPTER 9 EMG PROCEDURES
WHAT IS THE PRIMARY CONCERN WITH VOLCANIC ASH ON NAVAL AIRCRAFT - THE EXTREME ABRASIVENESS OF THE ASH.
-
509-3 CHAPTER 5 SURFACE TREAT
WHAT ARE ENCAPSULANTS - THEY ARE MATERIALS USED TO COVER A COMPONENT OR ASSEMBLYS IN CONTINUOUS ORGANIC RESIN.
-
TSP
WHAT ARE THE THREE SOURCES OF TSP CONTRIBUTIONS? -
EMPLOYEE
AGENCY AUTOMATIC
MATCHING -
TSP
EMPLOYEE WHAT ARE THE TWO TYPES? -
REGULAR
CATCH-UP -
TSP
AT WHAT AGE CAN YOU BEING TO MAKE CATCH-UP CONTRRIBUTIONS? - 50
-
TSP
WHO ARE ELLIGABLE FOR AGENCY AUTOMATIC CONTROBUTIONS? -
IF YOU A FERS EMPLOY
FEDURAL EMPLOYEE. -
TSP
AT WHAT AGE ARE YOU ON LONGER GOING TO RECEIVE PENTALIES FOR PULLING OUT TSP MONEY? - 55 BEFORE THEN YOU MAY BE SUBJECT TO A 10 PERCENT TAX FEE
-
TSP
WHO ARE THE "L" FUNDS DESIGNED FOR? - THE "L" FUNDS ARE DESIGNED FOR PARTICIPATS WHO MAY NOT HAVE THE EXPEREINCE, TIM E, OR INTEREST TO MOVE THEIR MONEY.
-
TSP
WHAT IS THE "G" FUND -
THE "G" FUND GOVERNMENT SECURITIES INVESTMENT.
SHORT TERM U.S. TREASURY SECURITIES. -
TSP
WHAT IS THE "F" FUND -
FIXED INCOME FUND
INVESTED IN BONDS -
TSP
WHAT IS THE "C" FUND -
COMMON STOCK INDEX INVESTMENT FUND
STOCK INDEX FUND TRACKS THE S&P 500. -
TSP
WHAT IS THE "S" FUND -
SMALL CAPITALIZATION STOCK INDEX
TRACKS THE DOW JONES WILSHIRE MARKET. -
TSP
WHAT IS THE "I" FUND -
INTERNATIONAL STOCK INDEX FUND
TRACKS THE MORGAN STANLEY CAPITAL INTERNATIONAL -
TSP
WHAT IS AN INTERFUND TRANSFER - AN INTERFUND TRANSFER IS MOVING TH EMONEY ALREADY IN YOUR ACCOUNT FROM ONE FUND TO ANOTHER. YOU CANNOT MOVE DOLLAR AMOUNTS ON LY PERCENTAGES.
-
TSP
HOW ARE ADMINSTRATIVE FEE'S FOR PRINTING AND ADMINSTRTAING THE PROGRAM PAID FOR? - THEY ARE PAID FOR BY FEDERAL EMPLYOEES THAT FORFEITURE OF AGENCY AUTOMATIC CONTRIBUTIONS OF FERS EMPLOYEES THAT LEAVE THE SERVICE BEFORE THE VESTED TIME HAS PASSED.
-
TSP
WHAT ARE THE THREE WAYS TO GET YOUR MONEY OUT OF TSP? -
A LOAN
AN INSERVICE WITHDRAW
A POST SEPERATION WITHDRAW -
TSP
WHAT ARE THE TWO DIFFERENT TYPES OF TSP LOANS? -
A GENERAL LOAN
A LOAN FOR THE PURCHASE OR CONSTRUCTION OF A PRIMARY HOME. -
TSP
HOW MANY DAYS MUST YOU WAIT AFTER REPAYING A LOAN TO TAKE OUT ANOTHER ONE? - 60
-
TSP
HOW MUCH CAN YOU BORROW AT A TIME FROM TSP? - 1000-50000
-
TSP
WHAT ARE THE THREE WWITHDRAWAL TYPES? -
A SINGLE PAYMENT
A SERIES OF MONTHLY PAYMENTS
A TSP LIFE ANNUITY -
TSP
BY LAW, YOU MUST WITHDRAW YOUR ENTIRE ACCOUNT OR BEGIN RECEIVING MONTHLY PAYMENTS BY TSP. - 70 1/2
-
TSP
BY LAW HOW OFTEN MUST THE TSP BEAUDITED? - TSP MUST BE AUDITED AT LEAT ANNYALLY
-
FRATERNIZATION
WHAT IS THE OPNAV INSTRUCTION COVERING THE NAVY FRATERNIZATION POLICY - OPNAV INST 5370.2B
-
FRATERNIZATION
WHAT ARE THE THREE PROHIBITED RELATIONSHIPS IN THE NAVY UNDER OPNAV 5370.2B -
OFFICER TO ENLISTED
JUNIOR ENLISTED E1-E6 TO SENIOR ENLISTED E7-E9
ANY OTHER REALATIONSHIP THAT IS PREJUDICIAL TO GOOD ODER AND DISPLINE. -
FRATERNIZATION
CAN SERVICE MEMBERS MARRIED TO EACHOTHER WILL NOT BE IN THE SAME CHAIN OF COMMAND.
TRUE OR FALSE? - TRUE
-
FRATERNIZATION
WHEN MUST SAILORS BE TRAINED ON MATTERS OF FRATERNIZATION? - UPON INDOC AND THEN AGAIN ANNUALLY THEREAFTER.
-
4790 V 17
WHAT IS PHASE ONE OF SE TRAINING? - TRAINING IN THE OPERATION AND O-LVL MAINTENANCE OF SE
-
4790 V 17
WHAT IS PHASE TWO OF SETRAINING - TRAINING AND QUALIFICATION O/I LVL OF PERSONNEL IN THE OPERATION OF SE
-
4790 V 17
WHAT IS THE SE LIC FORM NUMBER - 4790/102
-
4790 V 17
WHO IS DESIGNATED AS THE SE OPERATOR AND TRAINING AND LICENSEING PROGRAM MANGER O LEVEL AND I LEVEL -
O LVL
AMO BY DXESIGNATION FROM THE MO
I LVL
SE DIVISON OFFICER BY DESIGNATION BY THE MO -
4790 V 17
WHO IS RESPONSIBLE TO ENSURE THAT ALL SE IS PROPERLY MAINTIANED AND OPERATOR - MAINTENANCE OFFICER
-
4790 V 17
HOW MANY DAYS IN ADVANCE DOES THE I LVL COMMAND HAVE TO PUBILISH THE SCHEDULE FOR SE CLASSES - 30 DAYS
-
4790 V 17
HOW MANY YEARS IS A SE LICENSE VALID FOR - 3 YEARS OR UNTILL MEMBERS MOTOR LICENSE EXPIIRES
-
4790 V 17
WHAT IS REQUIRED ENTRY FOR I LVL SE LICENSES IN BLOCK NINE (TYPE OF EQ OPERATED) - FOR NON AIRCRAFT USE ONLY.
-
4790 V 17
WHAT IS THE REQUIREMENT FOR PHASE ONE INSTRUCTORS? - MUST BE AN E5 AND QUALIFIED ON THE GEAR INSTRUCTING
-
4790 V 17
WHAT IS THE MIN PASSING GRADE OF SE LICENESE? - 85 PERCENT
- WHAT IS THE CONCEPT OF QA?
- THE CONCEPT OF QA IS FUNDAMENTALLY THE PREVENTION OF THE OCCURANCE OF DEFECTS
- WHAT DOES THE ACHIEVEMENT OF QA DEPEND ON?
-
QA DEPENDS ON
PREVENTION
KNOWLEDGE
SPECIAL SKILLS - HOW LONG AFTER TRANSFER MAY A QA STAMP BE REASSIGNED?
- NOT LESS THEN 3 MONTHS
- HOW LONG ARE TEMP CDQAR'S ASSIGNED FOR?
- 90 DAYS
- DURING TRANSIENT OF IN -FLIGHT MAINTENANCE WHO IS AUTHROIZED TO SIGN AS INSPECTOR IN THE ABSENCE OF QA?
- PILOT IN COMMAND, A DESIGNATED QUALIFIED MEMBER OF AIRCREW, OR THE SENIOR MAINTENANCE PERSONNEL.
- OINC CAN SIGN THE /12 AND DESIGNATE QA PERSONNEL WHEN WHAT CONDITIONS ARE MET?
-
THE DEPLOYMENT EXCEEDS 90 DAYS
ALL PROCEDURES AND REQUIREMENTS FOR DESIGNATED QA PERSONNEL ARE ACCOMPLISHED BY THE DETACHMENT. - WHAT ARE THE 6 PROGRAMS THAT QA MANAGES?
-
CTPL
AUDITS
SAFETY (MAINTENANCE)
GAS FREE
SE MIS-USE AND ABUSE
NAMDRP - WHAT ARE THE 2 FUNCTIONS THAT CTPL PROVIDES?
-
CENTRAL SOURCE OF UP-TO-DATE INFORMATION
EXXCELLENT SOURCE OF REFERENCE. -
WHO IS RESPONSIBLE FOR MAINTENANCE SAFETY.
(WHO MANAGES THE PROGRAM) - QUALITY ASSURANCE SUPERVISOR
- WHAT IS THE FORM NUMBER FOR AN SE-MIS-USE AND ABUSE
- OPNAV 4790/108
- WHAT IS THE OBJECTIVE OF THE AVGFE PROGRAM?
- THE OBJECTIE IS TO ENSURE A SAFE ENVIORMENT IS MAINTAINED WHEN WORKING ON AERONAUTICAL EQUIPMENT FUEL CELL AND TANKS.
- WHAT IS DEFINED AS INSUFFICIENT DEMAND FOR AVGFE PERSONNEL
- 3 AVGFE REQUIREMENTS IN A 6 MONTH PERIOD.
-
chapter 12
who shall designate personnel "safe for flight"? - the commanding officer shall designate members safe for flight
-
chapter 12
what is the form number of the "A" sheet? - opnav 4790/141
-
chapter 12
how many flights of discrepancies shall be maintained in the adb? - 10
-
chapter 12
define hot refueling? - it is an operation in where the aircraft is fueled while engines are running.
-
chapter 12
define hot seating - hot seating is an operation in which teh crew is swapped out while the engines are running for immediately relaunch.
-
chapter 12
during a hot seat evolution who releases the aircrat safe for flight. - the debarking pilot
-
chapter 12
how long are fcf checklist maintianed? - 6 months or 1 phase cycle which ever is greater
-
chapter 12
what is the form number of the daily card? - opnav4790/38
-
chapter 12
what is the form number of the support eq transaction report? - opnav4790/64
-
chapter 12
what day of the month shall the MMP be publishied by? - the 25th of each month
-
chapter 12
how many days prior to the induction date of an aircraft shall you submit a standard depot level maintenance special work request opnav 4790/65? - 30
-
chapter 12
what it the useage requirements for a Category A preservation? - anticipated usage within the next 90 days
-
chapter 12
what it the useage requirements for a Category B preservation? - anticipated usage within the next 180 days, and may be placed in level I preservation
-
chapter 12
what it the useage requirements for a Category C preservation? - anticipated usage within the greater then 180 days this eq shall be placed in level II or III preservation depending on the resources aviable.
-
chapter 12
what is the prefered method of preservation? - level III is the prefered method of preservation, "dehumidification"
-
chapter 12
what is the time requirement for level I preservation? - 0-90 days +/- 3 days
-
chapter 12
what is the time requirement for level II preservation? - 0-1 year
-
chapter 12
what is the time requirement for level III preservation? - 0-indefinite
-
chapter 12
at i level how many days after assuming the MMCO or MALS AMO billet is the officer required to take the AIRSPEED online course? - within 90 days of assuming the title.
-
chapter 12
project codes
BK0 - REQUISITIONING MATERIAL TO REPAIR SE
-
chapter 12
project codes
BK1 - REQUISITIONING MATERIAL TO STOP AN AWP CONDITION NOT TO BE USED FOR EXREP ITEMS
-
chapter 12
project codes
ZC8 - REQUISITIONING MATERIAL TO STOR AN AWP CONDITION USED FOR XREP ITEMS NMCS/PMCS
-
chapter 12
project codes
ZF7 - REQUISITIONING MATERIAL TO "BROAD ARROW"
-
chapter 12
project codes
ZQ9 - REQUISITIONING MATERIAL TO ENGINE MAINTENANCE WORK STOPPAGES FOR ALL TMS
-
chapter 12
I level prioities;
1 - support of NMC or PMC aircaft.this priority is also aassigned to commands leaveing on deployment within 30 days.
-
chapter 12
I level prioities;
2 - repair of critical LRCAs and SE. also O-lvl commands work stoppage requirements.
-
chapter 12
I level prioities;
3 - non-critical LRCAs and SE
-
chapter 12
I level prioities;
4 - processing of salvaged material and non aeronautaical material.
-
chapter 12
how long does the I-lvl command have to determine if they have the resources to test and check? - 24 hours after receipt
-
chapter 12
how long does the I-lvl have to ship the componeot to a repair faciality that hase repair ability? - 48 hours
-
chapter 12
what pubilication provides packaging requirements for material control - NAVSUP pubilication 700
-
chapter 10
who can acitivate ABDR techniques? - battle group commander, first flag officer, or general officer in teh chain of command. this cannot be deligated.